Cookie

This site uses tracking cookies used for marketing and statistics. Privacy Policy

  • Home
  • FAQs
  • How long does it take to build an MVP in Laravel?

How long does it take to build an MVP in Laravel?

A focused Laravel MVP ships in 8 to 12 weeks with two engineers. The first two weeks go into discovery and scope locking. Sprints 1 to 4 build the core product (six week build). Sprint 5 handles polish, QA, and payment integration. Sprint 6 is launch and handover. Mid sized MVPs with multi-tenancy, billing, and a polished admin extend to 14 to 18 weeks. Beyond that, it stops being an MVP and becomes a v1, which is a different engagement.